Appendix B. WASTEWATER FEE SCHEDULE


Latest version.
  • Fee Description
    Fee
    Application fee (non-refundable)
    $200
    Plan review fee (utility extensions/additions only)
    Base fee (up to ten connections)
    $400
    Additional fee per ERU in excess of ten connections
    $25
    Tap fee
    $7,500
    Inspection fee
    $100
    Disconnection fee
    $100
    Reconnection fees (as applicable per superintendent)
    Reconnection fee (direct utility power)
    $200
    Reconnection fee (secondary power)
    $100
    Reconnection meter base/disconnect fee (as applicable)
    $800
    Removal fee
    $1,250
    Major contributor permit fee
    $2,500
    Major contributor surveillance survey fee
    $300
    Generator permit fee
    $100
    (Ord. 2017-03, passed 9-11-17)