Appendix B. WASTEWATER FEE SCHEDULE
Latest version.
- Fee DescriptionFeeApplication fee (non-refundable)$200Plan review fee (utility extensions/additions only)Base fee (up to ten connections)$400Additional fee per ERU in excess of ten connections$25Tap fee$7,500Inspection fee$100Disconnection fee$100Reconnection fees (as applicable per superintendent)Reconnection fee (direct utility power)$200Reconnection fee (secondary power)$100Reconnection meter base/disconnect fee (as applicable)$800Removal fee$1,250Major contributor permit fee$2,500Major contributor surveillance survey fee$300Generator permit fee$100(Ord. 2017-03, passed 9-11-17)